Gold Processing PlantConsumer Products
Consultancy Services for Feasibility Study, Social and Environmental Impact Assessment Study and Facilitation of Financial Close for the proposed Gold Processing plant (CIL) at Buhunda in Misungwi district, Mwanza.
Busolwa Mining Limited
Po Box 3188
Mwanza
Baraka Ezekiel
Barakaezekiel78@gmail.com
- Assess supportive economic infrastructure which includes transport network, energy source, water supply, sanitation, telecommunication and specific attraction in the project influence area;
- Work out the estimated total investment costs for the proposed project which includes mining equipments, and accommodation;
- Advise on the financing structure, sources of funds and facilitate sourcing of funds for financial institutions;
- Propose project management structure during and after construction and the associated remuneration packages;
- Carry out EIA and SIA for the proposed project;
- Oversight plant design with respect to the ore reserve;
- Carryout pit optimisation and so financial modelling for the project;
- Facilitate processing of exemptions for mining equipments and fuel;
- Conduct economic and financial analysis to determine the project viability and present financial indicators i.e. Net Present Value (NPV); Internal Rate of Return (IRR); Average Return on Investment (RoI) and Payback Period
Nov – Jan 2016